ProjectsArchitectur
Multipurpose room Anne Frank
Multipurpose room Anne Frank
Year: 2001-2003
Employer: Municipality of Bolzano
Realized
The existing structures made it difficult to change the room and its consistence.
The new project modifies the air conditioning system integrating it in the furniture, which covers the room like a second skin. It consists of a row of cupboards along the inner walls of the room with sliding doors.
Also the question of how to store the chairs, tables and equipments was resolved through this second skin.
The inclination of the longitudinal walls gives the room a new dimension and character. Besides also the kitchen and the entrance hall were renovated.